![]() This illustrates the rammer compactor being used after the excavation for the pile foundation has been done and filling up the excavation once the piling had been completed. | ![]() The picture illustrates tyhe monitoring of what Franki Subcontractors have completed in their piling and comparing on what they said they would complete versus the actuality of it being done. |
|---|---|
![]() This is an ilustratuion showing how concrete is tested and where it is placed. | ![]() This shows a variety of people, making sure that the site accomodation is done properly: from the welders, electricains, to the carpenters. |
![]() This illustrates the work done after excavtion has taken place, blinding being placed as well as the labourers removing some of the reinforcement bars that are not required to placed the pile caps. | ![]() This illustrates the labelling of each pile completed from the driven rig pile, so that the Site Agent as well as the Labour and Plant Subcontractors (Acon) to know where to excavate. |
![]() "Where there is no vision people perish!" | ![]() This is the expected building that is going to be constructed |
![]() This is the Site. Lots of consideration and expectations were determined about the weather, soil condition and machinery in wet soil conditions etc. | ![]() This illustrates the importance of preliminaries as Group Five is essentially trying to manage the site by bringing electricains for the accomodation on site ro work and hold meetings |
![]() This shows how the driven rig pile has pushed down the soil and created a hole, which then the reinforcement bars are placed with Safety caps, since the ends are sharp. |